Our work speaks for itself.Three Train Stations:
1)Te Waihorotu Station 2) Maungawhau 3) Karanga-a- hape Station
Main Contractor: CRL Link Alliance
Contractor and Installer: The Tile People
Giacon Terrazzo is proud to provide NZ made terrazzo and precast for this massive project. Allowing us to use recycled and local NZ marble and aggregates in all the products made. We used the basalt that was tunnelled out of Mt Eden- crushing it and then used it in the pavers for this project. Helping to make sustainable construction possible.
We provided: over 11,000m2 of tiles and pavers
White terrazzo pavers 600 x 900 x 30mm , gray basalt chip pavers 600 x 900, gray basalt chip and red glass pavers 600 x 900 x 40mm; Gray off the mould pavers 600 x 300 x 40mm; Yellow tactiles 300 x 300 x 30mm and 300 x 300 x 40mm. Gray Tactile pavers 300 x 300 x 40mm; Platform Copings precast from 1200 x 600 x 100mm ( and other sizes); wall skirtings; precast terrazzo white stairs; precast terrazzo gray with basalt chip stair treads.
We only have limited images as they have not yet opened to the public